Maintenance

The Integrus system requires a few maintenance operations, which are given in the following
table.
Integrus component
Rechargeable battery
pack
Radiator
2013.11 | V1.4 |
Interval
Check
Regularly after three
The batteries are not leaking.
years.
Replace the battery if there is any sign of
leakage or corrosion.
Five years.
Replace the battery pack.
Ensure that only the battery pack
LBB 4550/10 is used.
Once a year
Inspect the installation, if radiators are
suspended.
If any sign of weakness or damage is
detected, remedial action should be taken
immediately.