Replacing Bushings; Installation Of Swing Axle - Husqvarna Rider 15V2 Workshop Manual

Hide thumbs Also See for Rider 15V2:
Table of Contents

Advertisement

For Husqvarna Parts Call 606-678-9623 or 606-561-4983

Replacing bushings

Once the swing axle has been removed the
bushings fitted to the rear frame must be replaced.
Remove these with a punch, see "Special Tools".
New bushings are fitted with the punch see "Special
Tools". Make sure that the bushing grooves are
lined up horizontally. It is important that the outer
edge of the outermost bushing is flush with the
outer edge of the hole. Lubricate the bushings with
a lithium-based grease.

Installation of swing axle

1
• Grease half of the axle (the half that has not
been turned down) and press it from the back
into the steering spindle (see diagram).
• Attach the washer and circlip on the swing axle's
inner holder.
• Fix the dust guard (with a thin lip behind) approx.
2/3 of the way in on the axle and lubricate the
axle on both sides of the dust guard.
www.mymowerparts.com
2
Roll the rear frame forwards and press it in on the
swing axle.
3 Rider 15V2
• Fit the washer and circlip on the pendulum shaft.
• Fit the hydrostatic transmission cable and its
casing (2+4).
• Attach the cable to the neutral position contact
(5).
• Fit the rear belt (8).
• Attach the brake cable to the arm under the tank
and the casing fixture on the rear frame (6).
• Fit the idler's spring (1).
• Fit the hydrostatic transmission's fan and the
circlip (7).
Reparation instructions
39
English –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rider pro 18Rider pro 15

Table of Contents