Hitachi J300U Series Instruction Manual page 85

Three phase input 200/400v class
Hide thumbs Also See for J300U Series:
Table of Contents

Advertisement

Inspection
Inspection item
location
Terminal board
No damage.
Main
circuit
Smoothing
(1) Check for leaking
capacitor
(2) Check for swelling
Relays
(1) Check for stuttering noise
Resistors
(1) Check for large cracks
Cooling fan
(1) Check for abnormal
(2) Check for dust
Daily Inspection and Periodic Inspection (2/3)
Inspection cycle
Inspection content
Regularly Periodic
when operating
or changes in color
vibrations and noise
Inspection method
Criteria
Visual inspection
No abnormalities.
Visual inspection of
No abnormalities in (1) and
(1) and (2).
(2).
(1) Aural inspec-
(1) No abnormalities.
tion.
(1) Visual inspection. (1) No abnormalities.
(1) Rotate manually
(1) Smooth rotation
with power off
and increase
tightening
(2) Visual inspection
(2) No abnormality
Standard
Instruments
replacement
period
___
___
___
5 years
(Note 1)
5 years
___
___
___
2 - 3 years
___

Advertisement

Table of Contents
loading

This manual is also suitable for:

J300 series

Table of Contents