STEP 2
(See Diagram 2)
A.) Attach the Left Base and the Power Station Base Frame (#2 & #3) to the Right Base
Frame (#1).
B.) Align the holes and secure them with two M10 x 2 ½" Carriage Bolts (#98),
(#109), and M10 Aircraft Nuts (#106).
8
¾" Washers
DIAGRAM 2