Mitsubishi Electric AG-150A Instruction Book page 40

Air-conditioner control system centralized controller
Hide thumbs Also See for AG-150A:
Table of Contents

Advertisement

(7) Define the seasons
Enable/disable
switching button
6-3-2-2 Setting the annual schedule (Applicable only when the license is registered)
Selecting [Schedule Setting] from the main menu on the [Main operation screen] will bring up the schedule setting screen.
Subsequently, selecting [Annual] from the sub menu will bring up the annual schedule setting screen. You can use the annual
schedule to set schedules for days such as public holidays and summer vacation that need to be scheduled differently to the weekly
schedule. For each air conditioner group, it is possible to set 50 day-long settings up to 24 months into the future (including the
current month).
Settings for days that have passed will be deleted automatically.
To make the settings for the annual schedule, first select the item to be set, and then touch [Edit] to bring up the annual schedule
screen. Make the settings for the five patterns (pattern A through E) on the weekly schedule screen, and then assign those patterns
to appropriate dates (e.g., holidays, or summer break).
Note: When the contents of an operation are executed as part of a schedule these contents will continue to be in effect until they are
changed by a schedule or browser etc. Therefore, if you are setting a schedule that is only for a particular day, be sure to set
your schedule in a way that will not impact on the next day's operation.
For example, if you wish to prohibit operations being performed from the remote controller after 17:00, set a Prohibit operation
for 17:00 and set an Enable operation for 23:59.
(1) Select the item to be set.
As with the weekly schedule setting, select the item to be set. (Refer to 6-3-1 (1).)
(2) Select a pattern.
Weekly 1: Applicable period
Pressing the Season Settings button on the schedule setting screen
(
each seasons can be defined, to which [Weekly 1] or [Weekly 2]
schedules are applied.Touch the "Enable/disable switching button" to
enable or disable the "Weekly 2" setting.
* The period setting can go past 12/31 (i.e., 11/1~3/31).
Weekly 2: Applicable period
Touching the alphabetic letters in the calendar or touching the Edit
button in the annual schedule screen will bring up the schedule
pattern setting screen. Select the pattern you want to edit.
Note: When multiple groups are selected, those settings that have
Edit schedule patterns
Pattern Menu
– 39 –
) will bring up the Season Settings screen, and the duration of
been made for each group will not be displayed.
Press [OK] to delete the schedule, or press [Cancel] to exit the
screen without saving any changes.