Appliance Preparation

A. Attaching Sheetrock Ledges
Attach sheetrock ledges together using the attachment
holes (see Figure 9.1).
ATTACHMENT
SEE DETAIL A
Figure 9.1
The sheetrock ledges will attach to the top of the unit (see
Figure 9.2).
SEE DETAIL B
UNIT
SURROUND
ATTACHMENT
HOLES
6 PLACES
Figure 9.2
32
DETAIL A
HOLES
NAILING
TAB
DETAIL B
SHEETROCK
LEDGE
CLEARANCE SLOT
Heat & Glo • 8000CF-OAK-IPI • 2059-900 Rev. Q • 11/08
Attach previous assembly to the top of the unit using the
provided slots. The face of the sheetrock ledge assembly
and the unit surround should be fl ush to each other.
B. Temporary Access Panel
Remove the lower access panel to run the electrical and
gas lines to the unit (see Figure 9.3).
Once the electrical and gas lines are hooked up, the lower
access panel must be put back on the unit.
LOWER
ACCESS PANEL
Figure 9.3