Download Print this page

Installation Requirements; Sleeve Installation - Fujitsu ASU9CQ Operating Manual

Heat&coqling model (reverse cycle) room air conditioner wall mounted
Hide thumbs

Advertisement

Table of Contents
920-007-14
Installation requirements
STEP 1 The WSC SLEEVE should be positioned so that the
DRAIN EXTENSION -extends a minimum of'l{." beyond
the OUTSIDE WALL (See Figure 7).
STEP 2 The WSC SLEEVE must extend aminimum of
Vt"
beyond
the INSIDE WALL.
STEP 3 The WSC SLEEVE must be installed level side to side.
FigureS
Front Unit Rest
- - . . . I
STEP 4 The WSC SLEEVE must also be installed with adownward
tilt toward the outside of the building. If a level is placed
so that it rests on the FRONT and BACK UNIT REST as
shown in Rgure 8, a properly installed unit provides a %
bubble slope to the outside of the building.
CAUTION: SLEEVE projections and leveling precautions
must be observed to
prevent
the entry ofwater into the room.
SLEEVE projections and leveling
===.;;.J
precautions must be observed
to prevent the entry of water into the room.
Sleeve installation
STEP 1 After unpacking
the
WSC SLEEVE from the carton, remove
the corrugated FRONT PANEL. Place the WSC SLEEVE
in the wall opening following the instructions given in the
INSTALLATION REQUIREMENTS. Attach the SLEEVE to
the INSIDE WALL by driving two#12A x2" screws in each
side of the SLEEVE (see Figure 7). Shim at the top of the
SLEEVE, midway between the sides. Drive one #12A x2"
screw in the top of the sleeve, close to the shim. Install
screws from inside the SLEEVE. Ifthe wall opening is not
framed with wood, use expansion anchor bolts or molly
(toggle) bolts (not provided).
Please note that there will be an excess of
two
#12Ax2"
screws that will not be used.
STEP 2
Once the SLEEVE has been installed, check the LEVEL
again to be sure the
%
bubble downward tilt is maintained.
Apply shims, if required, to maintain the proper slope.
STEP 3
Caulk the perimeter ofthe entire opening on the inside and
the outside between the SLEEVE and the WALL.
STEP 4
The corrugated front panel removed in Step 1above must
be remounted back in place ifmasonry work is to be done
and/or if the "WaIiMaster" CHASSIS is to be installed at a
later date.
11

Hide quick links:

Advertisement

Table of Contents
loading

  Also See for Fujitsu ASU9CQ

  Related Manuals for Fujitsu ASU9CQ

This manual is also suitable for:

Asu12cqAou9cqAou12cq