MMB Web-UI (Web User Interface) Operations
If the maintenance work (Either Hot System Maintenance, Warm System Maintenance or Cold System
Maintenance) of the system executed in the schedule execution time, the scheduled operation does not
execute the power operation of the system.
If the schedule overlaps on the same day, it is processed according to the following priority levels.
Special > Monthly > Weekly > Daily
Daily: Schedule executed every day
Weekly: Schedule executed every week
Monthly: Schedule executed every month
Special: Schedule executed on specific day every year
Moreover, if the Power On and Power Off is specified at the same time, the priority is given to Power Off.
Because System does not do Power On in Power On Delay, Schedule Power Off is disregarded. Moreover,
when OS does not accept the Shutdown demand, Power Off is not done.

TABLE 1.143 Display Items and Setting Items of [Schedule Control] Window

Items
Schedule Control
Number of schedules

FIGURE 1.104 [Schedule Control] Window

Sets whether schedule operation is done for system.
On
Off
Default setting is Off.
Displays the number of schedules that are set.
Description