Power Control] Window; Figure 1.103 [Power Control] Window - Fujitsu PRIMEQUEST 2000 Series Tool Reference

Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

MMB Web-UI (Web User Interface) Operations
Message Number
I_00013
E_00100
W_00426
For details on the messages displayed on the window, see
(C122-E178EN).

1.7.7 [Power Control] Window

[Power Control] window displays the power control of the system.
Remarks
When the operating system supports ACPI (Advanced Configuration and Power Interface), the power can be
turned Off after the operating system is Shutdown by Power Off operation. If ACPI is not supported, power
can be Off without the Shutdown of the operating system. Moreover, even if the operating system supports
ACPI, and applications running on the operating system are not supported, sometimes power Off is not
possible. Since these depend on the specifications of the operating system and applications, for details, refer
to the operating system and application specifications.
1.
Select the process executed for the system from Pull-down menu of [Power Control].
Then, click the [Apply] button.
Dialog box for confirmation appears.
2.
Click the [OK] button to execute the process.
Click the [Cancel] button to cancel the process.
When sytem Power is On, or when Power is Off, and when the specified control is failed, Warning
dialog box appears.
Message
Setting completed.
Failed to set the System Setup
Invalid values specified.

FIGURE 1.103 [Power Control] Window

PRIMEQUEST 2000 Series Message Reference

Advertisement

Table of Contents
loading

Table of Contents