Download Print this page

LG LWS3081ST Installation Manual page 5

Electric convection built-in oven
Hide thumbs Also See for LWS3081ST:

Advertisement

_-j
INSTALLATION
DRAWINGS
(FOR 30"
DOUBLE
BUILT-
IN OVEN)
The first step of your installation
should
be to measure your current cutout dimensions
and compare them to the
cutout dimensions
shown below. You may find little or no cabinet work will be necessary.
IMPORTANT
NOTE
• The cabinet base platform
must be able to support
3251bs (147Kg). If the cabinet does not have a solid bottom,
two braces or runners must be installed
level with the bottom
of the cutout to support the weight of the oven.
Make sure the base is level and front of cabinet is square. If the cabinet base is not level, the oven glides will
tend to slide out when opening
the door.
• If marks, blemishes
or the cutout opening
are visible above the installed
oven, it may be necessary to add wood
shims under the runners and front trim until the marks or opening
are covered.
• If the cabinet does not have a front frame and the sides are less than 3/4" (1.9 cm) thick, shim both sides equally
to establish
the cutout width.
• The junction
box must be flush with the rear wall of the cabinet as shown below.
• Allow at least 23" clearance for door depth when it is open.
27 3/8"
(69.5cm)
52 1/16"
(132.2 cm)
29 3/4"
(75.5 cm)
51 5/8"
(131.0cm)
23 3/8"
(59.3 cm)
Cabinet Width
Recommended
Minimum
Cutout location
from floor
Cutout
Depth
Cutout
Width
Cutout Height
30" (762 mm)
12" (304.8 mm)
23 1/2" Min. (596.9 mm)
28 1/2" Min. (723.9 mm)
28 5/8" Max. (727 mm)
51 13/16" Min. (1316 mm)
51 15/16" Max. (1319.2 mm)
Allow 1"
minimum for _,
overlap of oven _"
_ _S_
_
-5-
Allow 1"
minimum for
overlap of oven
51 13/16" Min.
51 15/16" Max.
.23 1/2"
Junction Box
I
Location
47"
Minimum cutout location from floor 12"

Advertisement

loading

This manual is also suitable for:

Lwd3081stLswd305stLsws305stLws3010stLwd3010st