American standard town square accessories installation instruction (2 pages)
Summary of Contents for American Standard Brook Console Table 9373.100
Page 1
ASSEMBLY & INSTALLATION INSTRUCTIONS Brook Console Table 9373.100 VANITY TOP RECOMMENDED SINKS WOOD TOP (OPTIONAL) MORNING 9474.670 LOFT MARBLE TOP (OPTIONAL) OVALYN 9476.495 Thank you for selecting our products...products which have been the benchmarks of fine quality for over 100 years. To help insure that the installation process will proceed smoothly, please read these instructions carefully before you begin.
Page 2
CONSOLE TABLE INSTALLATION Choose a location that provides enough clearance for side doors to open freely. Provide suitable reinforcement required for anchoring the vanity to the wall. Centerline of reinforcement should be 31- 3/4" up from the floor (see Figure 1). The molding needs to be notched to seat the vanity flush against the wall (see Figure 2).
Page 3
After top is replaced, connect the trap to the drain assembly hand tight to check alignment. It may be necessary to cut off part of the tailpiece (area "A") or part horizontal leg of the trap (area "B"). Connect hot and cold supply lines to the shut off valves. Tighten trap joints for watertight assembly.
Page 4
This warranty gives you specific legal rights. You may have other statutory rights that vary from state to state or province to province, in which case this warranty does not affect such statutory rights. In the United States: American Standard Inc. P.O. Box 6820 Piscataway, New Jersey 08855...