Electrolux EIMGD60LT3 Installation Instructions Manual page 14

Front load gas & ectric dryer
Table of Contents

Advertisement

Available languages

Available languages

installation
instructions
Gas connection
1.
Remove the shipping cap from gas pipe at the
3.
rear of the dryer.
Open the shutoff valve in the gas supply line to
allow gas to flow through the pipe. Wait a few
minutes for gas to move through the gas line.
2_
Connect a 1/2 inch (1.27 cm) I.D. semi-rigid or
approved pipe from gas supply line to the 3/8
inch (0.96 cm) pipe located on the back of the
dryer. Use a 1/2 inch to 3/8 inch (1.27 cm to
0.96 cm) reducer for the connection. Apply an
approved thread sealer that is resistant to the
corrosive action of liquefied gases on all pipe
connections.
Manual
GAS FLOW
Shutoff
Flare
_
Flare
Valve
Union
Union
_-los
t
i
Flexible
Inlet Pipe on
Open
Connector
Back of Dryer
All connections must be wrench-tightened
Shutoff Valve-
Open position
.
Check for gas system leaks with a manometer.
If a manometer is not available, test all
connections
by brushing on a soapy water
solution.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents