Download Print this page
Amana NDG2330AWW Installation Instructions
Amana NDG2330AWW Installation Instructions

Amana NDG2330AWW Installation Instructions

Advertisement

Quick Links

BgmLT BETTER THAN mTHAS TQ B_"
Installation
Instructions
Gas Dryer
Keep
instructions
for
future
reference.
Be
sure
manual
stays
with
dryer.
Questions?
See Owner's
Manual
or
call Amana
Consumer
Affairs
Department
1-800-843-0304
You'll
Need
a Few
Things
Before
You Begin
Stainless Steel
or Hard Pipe
Gas Connector
Duct
Tape
Teflon
Tape or
Joint
Compound
Wrench
Screw
Drivers
Level
REMOVE
PARTS
AND CLEAN
DRYER
DRUM
Optional
Kits
Kits are available at extra cost through
your Amana dealer or
Amana factory 1-800-843-0304.
Directional
Exhaust
Kit
DK1 Sales Accessory (Directional
Exhaust Kit #528P3).
Flexible Metal Vent Kit
Exhausting the dryer in hard-to-reach
locations can be accomplished by
installing Kit # 521P3.
Manufactured
(Mobile) Home
Installation Kit
Manufactured home anchor Kit
#526P3.
Propane Gas Conversion
Kit
LPK1 Sales Accessory (LP./Propane
Kit # 649P3).
CONNECT
DRYER
TO
EXHAUST
SYSTEM
Secure all joints with clamps or duct
tape. DO NOT use sheet metal
screws or other fastening means
which extend into the duct to attach
exhaust pipe joints. They could
catch lint and reduce the efficiency
of the exhaust system.
IMPORTANT: Keep exhaust duct
as short as possible.
Be sure old ducts are clean before
installing your new dryer.
To prevent backdraft when dryer is
not in operation, outer end of
exhaust pipe must have a weather
hood with hinged dampers (obtain
locally).
Weather hood should be installed
at least 12" (30.5 cm) above the
ground. Higher clearances may be
necessary in areas where heavy
snowfall can occur.
No extra system length
consideration is necessary when
exhausting through the roof. Use
MAXIMUM EXHAUST LENGTH
table to calculate system length.
Use a roof cap that provides air
flow equal to weather hood.
Exhaust
Directions
Dryer can be exhausted to the
outdoors through the back, right, or
bottom of the dryer. Gas dryers
cannot be vented out the left
side because of the burner
housing.
Dryer is shipped from factory ready
for rear exhaust. No kits required.
To exhaust dryer through sides or
bottom, install a DK1 Sales
Accessory (Directional Exhaust Kit
528P3). Available as optional
equipment at extra cost.
Exhaust
System
Materials
Exhaust duct must be four inches
(10.2 cm) in diameter without
obstructions. Rigid metal duct is
recommended.
Non-combustible
semirigid flexible metal duct is
acceptable.
DO NOT use plastic pipe, foil pipe,
or flexible plastic pipe, because it
contributes to poor drying
performance and collects lint, which
can lead to a fire hazard. To identify
flexible foil or plastic duct, pinch the
coils of the duct between your
fingers. If the coils can be brought
together, do not use the duct.
['se
Semirigid
Metalj
'-. Rigid Metal
f
--,
Do Not _se
Maximum
Exhaust
Length
Number of
90 ° Elbows
0
1
2
3
Rigid Metal Duct
Weather Hood
4-inch Opening
44 feet (13.4 m)
34 feet (10.4 m)
26 feet (7.9 m)
20 feet (6.1 m)
Weather Hood
2½-inch Opening
34 feet (10.4 m)
26 feet (7.9 m)
20 feet (6.1 m)
14 feet (4.3 m)
Number of
90 ° Elbows
0
1
2
3
Flexible Metal Duct
Weather Hood
4-inch Opening
24 feet (7.3 m)
20 feet (6.1 m)
16 feet (4.9 m)
12 feet (3.7 m)
Weather Hood
2½-inch Opening
20 feet (6.1 m)
16 feet (4.9 m)
12 feet (3.7 m)
8 feet (2.4 m)
NOTE: Deduct 6 feet (1.8 m) for each additional elbow.
Recommended
Weather
Hood
Recommended
for Short
Runs
Only
4" (10.16 cm)
4" (10.16 cm)
2-1/2"
(6.35 cm)
CONNECT
GAS
SUPPLY
L.P./Propane
DO NOT connect dryer to LP./
Propane gas service without
converting the gas valve. An LPK1
Sales Accessory L.R/Propane Gas
Conversion Kit 649P3 must be
installed.
Test for Gas
Leaks
After final gas
connection is made,
turn on manual gas
valve and test all connections in gas
supply piping for gas leaks. Leak
testing of the appliance shall be
conducted according to the
manufacturer's instructions.
1.
Place soap suds on connections.
2.
If bubbles appear, a leak is
present. Shut off gas supply
valve.
3.
Tighten joint if leak is at factory
fitting.
• If leak is not at factory fitting,
unscrew, apply more joint
compound, and tighten to
correct leak.
4.
Retest connection for leak after
tightening or adding joint
compound.
• Retest any connections that
were disturbed.
Connect gas supply to dryer using a new stainless steel flexible connector
or hard pipe (check local codes) according to illustration. Test for leaks and
check burner flame after gas supply is connected. See Checking Burner
Flame section on next page.
• Dryer must be connected to type of gas as shown on nameplate located
in the door recess.
• Use pipe joint compound insoluble on LP (propane) Gas, or Teflon tape,
on all pipe threads.
• Purge air and sediment from gas supply line before connecting it to the
dryer. Before tightening the connection, purge remaining air from gas line
to dryer until odor of gas is detected. This step is required to prevent gas
valve contamination.
Use new stainless
steel
flexible
connector
only if allowed by local codes (Use Design A.G.A. certified connector)
,_Y_","_'_
,_
I_)_
,,
I "£%
1/8 NlYF pipe plug
_).1
-
-
_/,,-'_,,,
(,
]
_5,
(for checking inlet
/8
_NI'I
has
_a
--
_
I
_
_as pressure)
connection
_
{,,_
I
_
".
*
"
Black
iron pipe
_
ent
Shorter
than 20' (6.1 m) _
pipe _
_/within
6 (1.8 m)
Lon(*er than 20' :6 1 m_ _/2"
PiPe "--'--
¢_A _,,9"
v •
a-
'
/_
pp
orurver.
For proper
operation
at
altitudes
above
2,500
feet
The natural gas valve spud orifice
size must be reduced to ensure
complete combustion. See table.
Altitude
Ft (M)
3000 (915)
6000 (1830)
8000 (2440)
9000 (2740)
10000(3050)
Orifice
Size #
43
44
45
46
47
Pa_
number
503778
58719
503779
503780
503781
i
CONNECT
POWER
CORD
TO
ELECTRICITY
POSITION
AND
LEVEL
DRYER
Place dryer in position, adjust all
legs (4) until dryer is level side to
side and front to back.
Drier
B,'fse_
Level.
I
Leveling
Leg
Part No.40091603
¢, 2000 Amana Appliances
,_
Printed in US.A. 09/00
Amana, Iowa 52204

Advertisement

loading

Summary of Contents for Amana NDG2330AWW

  • Page 1 Kits are available at extra cost through compound, and tighten to Altitude Orifice Stainless Steel Flexible Metal Duct For proper operation Duct Tape MAXIMUM EXHAUST LENGTH your Amana dealer or correct leak. Size # number Ft (M) altitudes above 2,500 feet or Hard Pipe Number of...
  • Page 2 Use 4" (10.2 cm) diameter rigid or flexible metal duct. Save These Instructions Use as few elbows as possible. Use duct tape on all joints. Part No.40091603 (,, 2000 Amana Appliances Printed in US.A. 09/00 Amana, Iowa 52204...

This manual is also suitable for:

Ndg7800awwNdg5800aww