Download Print this page

Haier AD142ALEAA Operation And Instruction Manual page 15

Haier duct type air conditioner operation & instruction manual
Hide thumbs

Advertisement

Installation Manual For Indoor Unit
After selecting the unit installation location, proceed the following steps:
1. Drill a hole in the wall and insert the connecting pipe and wire through a PVC
wall-through tube purchased locally. The wall hole shall be with a outward down
slope of at least 1/100. (See Figure 2)
2. Before drilling check that there is no pipe or reinforcing bar just behind the drilling
position.
Drilling shall avoid at positions with electric wire or pipe.
3. Mount the unit on a strong and horizontal building roof. If the base
is not firm, it will cause noise, vibration or leakage.
4. Support the unit firmly.
5. Change the form of the connection pipe, connection wire and drain
pipe so that they can go through the wall hole easily.
Unit model
For series 142
For series 182 242
a
b
c
538
483.5
131
1002
483.5
131
c
Fig 2
e
d
f
610
255
105
1105
255
105
14
g
h
i
418
508
220
880
970
220
i

Advertisement

loading

  Related Manuals for Haier AD142ALEAA

This manual is also suitable for:

Ad182aleraAd142aleraAd182aleaaAd242aleaaAd242alera