Connection Pipe Requirement; Installation Procedure - Haier AC282AFEAA Operation And Installation Manual

Convertible type
Hide thumbs Also See for AC282AFEAA:
Table of Contents

Advertisement

Installation of Indoor Unit

CONNECTION PIPE REQUIREMENT

Table 1
M o d e l
For series 522, 482, 602
For series 282, 362

INSTALLATION PROCEDURE

Install the room air conditioner as follows:
1. REMOVE THE INTAKE GRILL AND SIDE COVER
(1) Remove the Air filters
(2) Remove the intake grilles
(3) Remove the Side cover A (Right and left side)
(4) This air conditioner can be set up to intake
fresh air . For information about how to install for
fresh-air intake, refer to page 22 "FRESH-AIR INTAKE".
2. LOCATION OF CEILING SUSPENSION BOLTS
30mm
Fig. 3
Suspension bolt pitch 1530mm
INDOOR UNIT (TOP VIEW)
For half-concealed installation
Supension-bolt pitch should be as shown in Fig.4.
40mm
Fig. 4
Ceiling Opening:640mm
Diameter
Liquid side
Gas side
9.52 mm
19.05mm
9.52 mm
15.88mm
Suspension bolt should
extend outward 30 to 50mm.
Ceiling Opening:1530mm
15mm
Ceiling panel
Maximum
length
50 m
30 m
Side cover A (Right side) Side cover A (Left side)
30mm
Dimensions
(Space Required for
installation)
10mm
155mm
300mm
40mm
Ceiling panel
14
Maximum height
(between indoor
and outdoor)
30 m
150 m
Air filter
Intake grille
Suspension bolt should
extend outward 30 to 50mm.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AC282AFEAA and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF