AEG BE1003001 User Manual page 23

Aeg oven
Table of Contents

Advertisement

Ceiling
You can fold down the heating element on the ceiling to clean the ceiling easily.
WARNING!
Before you fold down the heating element, deactivate the appliance. Make sure that the
appliance is cold. There is a risk of burns!
Folding down the heating element
1.
Remove the shelf supports.
2.
Hold the heating element with the two
hands at the front
3.
Pull it forwards against the spring pres-
sure and out along the support on both
sides.
4.
The heating element folds down.
The ceiling is ready to clean.
Installing the heating element
1.
Install the heating element in opposite
sequence.
Install the heating element correctly on the two sides above the support on the inner wall
of the appliance.
2.
Install the shelf supports.
Door and glass panels
To clean the door, remove it.
CAUTION!
Be careful when you remove the door from the appliance. The door is heavy!
Removing the door
1.
Open the door as far as it goes.
2.
Fully press clamping levers (A) on the
two door hinges.
3.
Close the door until the first position
(angle approximately 70°).
4.
Hold of the door with one hand on each
side and pull it away from the at an up
angle.
To install the door follow the procedure in
reverse.
The number of glass panels if different for the different models.
CAUTION!
Put the door with the outer side down on a soft and level surface to prevent scratches.
Care and cleaning
A
A
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Be5303071

Table of Contents