Applying Power; Viewing The Leds; Post Conditions And Results - Lenovo ThinkServer LPe12000 Installation Manual

Table of Contents

Advertisement

Applying Power

To apply power:
1. Verify that the HBA is securely installed in the computer.
2. Verify that the correct media is attached.
3. Plug in the computer and turn it on.
4. Watch the LEDs for Power On Self Test (POST) results.

Viewing the LEDs

You can see green and yellow LEDs through openings in the HBA's mounting bracket. The green LED
means firmware operation and the yellow LED means port activity. Each port has a corresponding set of
green and yellow LEDs.
Figure 7: LEDs

POST Conditions and Results

The following table summarizes POST conditions and results:
Note: For the link rate conditions, there is a 1 second pause when the LED is off between
each group of fast blinks (2, 3 or 4). Observe the LED sequence for several seconds
to be sure you have correctly identified the pattern.
Table 8. POST Conditions and Results
Yellow LED
Off
On
Slow Blink
Fast Blink
Flashing
Off
On
2 Fast Blinks
3 Fast Blinks
LPe12000, LPe12002 and LPe12004 Hardware Installation Manual
Port 0
LEDs
Port 1
LEDs
Green LED
Off
Off
Off
Off
Off
On
On
On
On
State
Wake-up failure (dead board)
POST failure (dead board)
Wake-up failure monitor
POST failure
POST processing in progress
Failure while functioning
Failure while functioning
2Gb/s link rate-normal, link up
4Gb/s link rate-normal, link up
Page 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkserver lpe12002Thinkserver lpe12004

Table of Contents