Cable Connection
S T E P
Various cables need to be connected to the rear of the ETERNUS DX Disk storage system.
●
Point
●
The cables should never be bent, twisted or pulled.
IMPORTANT
LAN Cable (for Operation Management)
Connect a LAN cable (for operation management) to each MNT port.
Cable
-Installation- "4.1 LAN Cable Connection (For Operation Management)"
Host Interface Cable
Connect a Host Interface cable to each of these ports.
Cable
FC, iSCSI 10Gbit/s, FCoE
●
(for FC cable connection)
iSCSI 10Gbit/s, FCoE
●
(for Copper Twinax cable
connection)
1Gbit/s iSCSI
●
SAS
●
-Installation- "4.2 Host Interface Connection"
To help with cable management and prevent incorrect connection, attach labels to the cables and make a
note of connection origins and destinations.
This step describes dual controller type as an example. Note that there is only controller 0 (CM#0) for single
controller type.
Rear view
Rear view
1Gbit/s iSCSI
ETERNUS DX80 S2/DX90 S2 Disk storage system Read Me First
Copyright 2013 FUJITSU LIMITED
Controller (CM#0)
RMT port
MNT port
CA#0
CA#1
FC, iSCSI 10Gbit/s, FCoE
(for FC cable connection)
Port#0
Port#1
Port#0 Port#1
10
Controller (CM#1)
Controller enclosure
RMT port
MNT port
CA#0
CA#1
Controller enclosure
iSCSI 10Gbit/s, FCoE
(for Copper Twinax cable connection)
Port#0
Port#1
SAS
Port#0
Port#1
P3AM-4872-11EN