System Reliability Guidelines - IBM System x3250 User Manual

Types 4364 and 4365
Table of Contents

Advertisement

v Before you install optional hardware devices, make sure that the server is
v Observe good housekeeping in the area where you are working. Place removed
v If you must start the server while the cover is removed, make sure that no one is
v Do not attempt to lift an object that you think is too heavy for you. If you have to
v Make sure that you have an adequate number of properly grounded electrical
v Back up all important data before you make changes to disk drives.
v Have a small flat-blade screwdriver available.
v You do not have to turn off the server to install or replace hot-plug Universal
v Blue on a component indicates touch points, where you can grip the component
v Orange on a component or an orange label on or near a component indicates
v When you are finished working on the server, reinstall all safety shields, guards,
v For a list of supported optional devices for the server, see http://www.ibm.com/

System reliability guidelines

To help ensure proper system cooling and system reliability, make sure that the
following requirements are met:
v Each of the drive bays has a drive or a filler panel and electromagnetic
v If the server has redundant power, each of the power-supply bays has a power
v There is adequate space around the server to allow the server cooling system to
working correctly. Start the server, and make sure that the operating system
starts, if an operating system is installed, or that a 19990305 error code is
displayed, indicating that an operating system was not found but the server is
otherwise working correctly. If the server is not working correctly, see
"Diagnostics" in the Problem Determination and Service Guide for diagnostic
information.
covers and other parts in a safe place.
near the server and that no tools or other objects have been left inside the
server.
lift a heavy object, observe the following precautions:
– Make sure that you can stand safely without slipping.
– Distribute the weight of the object equally between your feet.
– Use a slow lifting force. Never move suddenly or twist when you lift a heavy
object.
– To avoid straining the muscles in your back, lift by standing or by pushing up
with your leg muscles.
outlets for the server, monitor, and other devices.
Serial Bus (USB) devices.
to remove it from or install it in the server, open or close a latch, and so on.
that the component can be hot-swapped, which means that if the server and
operating system support hot-swap capability, you can remove or install the
component while the server is running. (Orange can also indicate touch points on
hot-swap components.) See the instructions for removing or installing a specific
hot-swap component for any additional procedures that you might have to
perform before you remove or install the component.
labels, and ground wires.
servers/eserver/serverproven/compat/us/.
compatibility (EMC) shield installed in it.
supply installed in it.
work properly. Leave approximately 50 mm (2.0 in.) of open space around the
front and rear of the server. Do not place objects in front of the fans. For proper
cooling and airflow, replace the server cover before turning on the server.
Chapter 2. Installing optional devices
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

System x3250 type 4364System x3250 type 4365

Table of Contents