Attention Installer; Electrical Connections - GE ZET1 Installation Instructions Manual

30” built-in wall oven
Hide thumbs Also See for ZET1:
Table of Contents

Advertisement

Installation Instructions

Electrical Connections

B

ATTENTION INSTALLER

All electric wall ovens must be hard wired
(direct wired) into an approved junction
box. A plug and receptacle is NOT permitted
on these products.
DO NOT shorten the flexible conduit.
The conduit strain relief clamp must be
securely attached to the junction box
and the flexible conduit must be securely
attached to the clamp. If the flexible
conduit will not fit within the clamp, do not
install the oven until a clamp of the proper
size is obtained.
NOTE TO ELECTRICIAN: The 3 power
leads supplied with this appliance are
UL recognized for connection to heavier
gauge household wiring. The insulation
of these 3 leads is rated at temperatures
much higher than the temperature rating
of household wiring. The current carrying
capacity of the conductor is governed
by the wire gauge and the temperature
rating of the insulation around the wire.
WARNING:
connection of aluminum house
wiring to copper leads can
result in an electrical hazard or fire.
Use only connectors designed for
joining copper to aluminum and follow
the manufacturer's recommended
procedure closely.
AVERTISSEMENT :
Le raccordement inadéquat d'un
câblage résidentiel en aluminium
à des fils de sortie en cuivre peut
entraîner un risque électrique ou
d'incendie. Utilisez uniquement des
connecteurs conçus pour raccorder
du cuivre à l'aluminium et respectez
minutieusement la procédure
recommandée par le fabricant.
Improper
Turn off the circuit breaker or remove
B1
fuses to the oven branch circuit.
With the oven supported on a table
B2
or platform in front of the cabinet
opening, connect the flexible conduit
to the electrical junction box as shown
below. Position the conduit in such a
manner that it will lie on top of the
oven in a natural loop when the oven
is installed. You will need to purchase
an appropriate strain relief clamp to
complete the connection of the conduit
to the junction box.
Conduit
48 1/2"
(123 cm)
long
Place oven on a
support to assist in
connecting conduit
10
Junction Box
5"
Location
(12.7cm)
BARE
GROUND
RED
WHITE
BLACK
Strain Relief Clamp
(not included)
must be used at
Junction Box
(Continued on following page)
GROUND
WIRE

Advertisement