IBM BJ0NJML - Service And Asset Management Integration Manual page 309

Integration guide
Table of Contents

Advertisement

After you perform this procedure, the INV collaboration switches will have the
following values.
Process Control ID
INV
INV
INV
INV
For example, when you set the value of the ISUIN integration control to 1, the
issue transactions are accepted from an external system. The INV collaboration
switch controls the update of inventory balance and cost related to issues. You can
adjust the setting of this switch, if necessary, so that the system bypasses that
update process.
The INV/EXT/THISMX collaboration switch controls the processing of inventory
(Process Control ID = INV) that is issued in the external system (System ID 1 =
EXT) and owned by the system (System ID 2 = THISMX).
If the value of the INV/EXT/THISMX collaboration switch were 0, the inventory
balance and cost values are updated. This is the default processing.
If the value of the INV/EXT/THISMX collaboration switch were 1, the default
processing is bypassed. The inventory balance and cost values are not updated.
In the example, ISUIN accepts any issues into the system. The INV/EXT/THISMX
collaboration switch determines how the inventory business component
processes a specific type of issue.
System ID 1
System ID 2
THISMX
EXT
EXT
THISMX
EXT
EXT
ORC
THISMX
Collaboration Switch Additions
Process Control
Value
1
1
1
0
295

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents