Craftsman 247.886914 Operator's Manual page 10

26" snow thrower
Table of Contents

Advertisement

Available languages

Available languages

7.
Makesureall cables areroutedto the left of the chutecontrolrod.Lineup
the holeinthe rodwith the arrowonthe inputshaftandinsertthe rodinto
the inputshaftbelowjoystickon handle panel.SeeFigure 7.
NOTE: Thechutecontrolrodwill fit snugglyintothe inputshaft.Support t he
rearofthe dashpanel w ith onehandwhileinsertingthe rodwith yourother
handto ensure the rodisinsertedall the wayinto the inputshaft.
8.
Nowpushthe chutecontrol r odbacktowardsthe handlepaneluntil the
holeinthe rodlinesup with the holeinthe chutecontrolinputclosest t o the
chutecontrol h ead.Insertthecotter pin.SeeFigure 8.
NOTE: Thesecond holeisusedto achieve further engagement of the
chutecontrol r odinto the inputshaftif required andcanbeusedlater
foradjustmentif the chutedoesnot fully rotate.Referto the Service &
Maintenance s ection for ChuteControl R od adjustments.
9.
Finishsecuring chutecontrolheadto chutesupportbracket w ith wing nut,
andclevispinandbow-tiecotter pinremoved earlier. D onot overtighten.
SeeFigure 9.
f
Figure 7
f
/
/
Figure8
f
\
Figure9
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents