Table Of Contents; What To Do Before Operation - Daikin FCQ71DV3B Operation Manual

Split system air conditioner
Hide thumbs Also See for FCQ71DV3B:
Table of Contents

Advertisement

CONTENTS
2. SAFETY CONSIDERATIONS ......................... 2
3. OPERATION RANGE...................................... 3
4. INSTALLATION SITE ...................................... 4
5. OPERATION PROCEDURE ........................... 4
6. OPTIMUM OPERATION ................................. 5
(FOR SERVICE PERSONNEL) ...................... 5
CONDITIONER ............................................... 7
9. TROUBLE SHOOTING ................................... 8
Important information regarding the refrig-
erant used
This product contains fluorinated greenhouse gases
covered by the Kyoto Protocol.
Refrigerant type : R410A
(1)
GWP
value : 1975
(1)
GWP = global warming potential
Periodical inspections for refrigerant leaks may be
required depending on European or local legislation.
Please contact your local dealer for more information.
1. WHAT TO DO BEFORE
OPERATION
This operation manual is for the following system
with standard control. Before initiating operation,
contact your Daikin dealer for the operation that cor-
responds to your system.
Indoor unit
Outdoor unit
Unit with
remote
controller
NOTE
• If the unit you purchased is controlled by a wire-
less remote controller, also refer to the wireless
remote controller's operation manual.
If your installation has a customized control system,
ask your Daikin dealer for the operation that corre-
sponds to your system.
• Heat pump type
This system provides cooling, heating, automatic,
program dry, and fan operation modes.
1
Unit without romote
controller
(When used as
simultaneous
operation system)
PRECAUTIONS FOR GROUP CONTROL
SYSTEM OR TWO REMOTE CONTROLLERS
CONTROL SYSTEM
This system provides two other control systems
beside individual control (one remote controller con-
trols one indoor unit) system. Confirm the following if
your unit is of the following control system type.
• Group control system
One remote controller controls up to 16 indoor units.
All indoor units are equally set.
• Two remote controllers control system
Two remote controllers control one indoor unit (In case
of group control system, one group of indoor units)
The unit is individually operated.
NOTE
• Contact your Daikin dealer in case of changing
the combination or setting of group control and
two remote controllers control systems.
Names and functions of parts
j
k
a
e
e
d
c
a Indoor unit
b Outdoor unit
c Remote controller
d Inlet air
e Discharge air
f Air outlet
g Air flow flap (at air outlet)
h Refrigerant piping, connection electric wire
i Drain pipe
Air inlet
j
The built-in air filter removes dust and dirt.
Drain pumping out device(built-in)
k
Condensate removed from the room during
cooling.
Ground wire
l
Wire to ground from the outdoor unit to pre-
vent electrical shocks.
RZQ100·125·140
i
h
f
g
b
RZQ71
d
e
f
l
English

Advertisement

Table of Contents
loading

Table of Contents