Chapter 3
Installing the WAVE-594 and WAVE-694
Figure 3-3
Step 6
Verify that the chassis is securely installed in the rack.
Front-Mounting in a 2-Post Rack
Follow these steps to front-mount the WAVE appliance in a 2-post rack:
There must be an empty 1RU space in the rack directly below the chassis to allow space for the back
Note
edge to sag. A sag of up to 1/2RU (7/8") is acceptable.
Prepare for installation by reading the
Step 1
page
installation.
Step 2
Attach the front rack mount brackets (item #1 in
in
Table
OL-24619-02
Rack-Mounting the Chassis
3-1) and verify that you have the correct tools and rack-mount hardware necessary for the
3-1). (See
Figure
3-4.)
Cisco Wide Area Virtualization Engine 594 and 694 Hardware Installation Guide
Rack Mounting and Cabling the WAVE-594 and WAVE-694
"Rack-Mounting Considerations, Parts, and Tools" section on
Table
3-1) using the six front bracket screws (item #4
3-5