Equipment Installed At High Altitudes; Air Supply And Ventilation - Dean 52 Series Installation & Operation Manual

Gas fryer
Table of Contents

Advertisement

2.4 Pre-Installation
General: Only a licensed plumber should install any gas-fired equipment.
A.
1.
A manual gas shut-off valve must be installed in the gas supply line ahead of the fryers for
safety and ease of future service.
2.
Dean Super Runner Series gas fryers operate on millivolt, and do not require an external
electric power supply.
Clearances: The fryer area must be kept free and clear of all combustibles. This unit is design-
B.
certified for the following installations:
1.
Commercial installation only (not for household use).
2.
Non-combustible floor installation equipped with factory-supplied 6-inch (15-cm) adjustable
legs or 5-inch (13-cm) casters;
3. Combustible construction with a minimum clearance of 6-inches (15-cm) side and 6-inches
(15-cm) rear, and equipped with factory-supplied 6-inch (15-cm) adjustable legs or 5-inch
(13-cm) casters.
Installation Standards
C.
1.
CE/EXPORT STANDARDS: Fryer installation must conform with local codes, or in the
absence of local codes, to the appropriate national or European Community (CE) standards.

2.5 Equipment Installed at High Altitudes

A. The fryer input rating (BTU/hr) is for elevations up to 2,000 feet (610-m). For elevations
above 2,000 feet (610-m), the rating should be reduced four-percent for each additional 1,000
feet (305-m) above sea level.
B. The correct orifices are installed at the factory if the operating altitude is known at the time
of the customer's order.

2.6 Air Supply and Ventilation

Keep the area around the fryer clear to prevent obstruction of combustion and ventilation airflow.
A. Do not connect this fryer to an exhaust duct.
B. Correct installation and adjustment will ensure adequate airflow to the fryer system.
2-2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Super runner 52 series

Table of Contents

Save PDF