Download Print this page

Operating Your Kegger Meister Operating Your Kegerator - NewAir AK-200 SERIES Owner's Manual

Kegerator
Hide thumbs

Advertisement

OPERATING YOUR KEGERATOR
Connect to the
Beer Line Tube
Black pull handle
Keg Coupler
fig.1
fig.4
Illustration A
Black Rubber Washer Installed in Wing Nut
Operating Your Kegerator
Dispensing Beer
Follow the steps below to dispense beer.
1.
Make sure that the kegerator is plugged in properly to a 120V, 60Hz,
15Amps grounded AC power outlet.
2.
Place the drip tray under the beer faucet to avoid messes from excess beer.
Open the beer faucet by pulling the tap towards you to dispense the beer.
3.
Note: If for any reason the beer does not come out of the tap, please refer to the
"Tapping the Beer Keg - Installing Keg Tap" section.
4.
Increase the pressure if the beer runs too slowly.
5.
Hold the glass steady at a 45° angle. When it is 2/3 full, straighten the glass.
Proper foam should be a tight creamy head and the collar on an average glass
should be ¾" to 1" high, ideally.
OCKWISECL
Connect to
RN
CO2 Gas
TU
Line Tube
Beer Keg Neck
fig.2
fig.5
fig.3
Beer Keg
Keg Support
Illustration B
Then Attach to CO2 Bottle Connector
9
Lift Upright

Advertisement

loading