Table 4-2. Activity Log Entries - NEC Express5800/320Ma User Manual

Active upgrade
Hide thumbs Also See for Express5800/320Ma:
Table of Contents

Advertisement

N O T E
You can only view status in the remote activity log. To
control the remaining steps of the Active Upgrade
process, you must minimize or close the connection to the
Upgrade Side and use the Active Upgrade console on the
Production Side.
Table 4-2
describes the general meaning of activity log entries that appear in the local
and remote activity logs.

Table 4-2. Activity Log Entries

Icon
Text Color
Green
Black
Black
Black
Red
Some upgrade items are collapsed into a single line. To display all of the associated
items, click the expand (+) button to the left of the item. To collapse them again, click
the collapse (-) button to the left of the item.
Double-click any item in the activity log to open a detail window with more information
about that item.
Severity
Description
Success
Task completed without error
Pending
Task is in progress
Information
Task information, no action necessary
Warning
A problem that should be addressed, but will not
block an upgrade
Error
A problem that must be corrected before continuing
with upgrade
Viewing Active Upgrade Process Status
Performing the Upgrade
4-23

Advertisement

Table of Contents
loading

Table of Contents