Table 4-1. Activity Log Entries - NEC Express5800/320Ma User Manual

Active upgrade
Hide thumbs Also See for Express5800/320Ma:
Table of Contents

Advertisement

Performing a Readiness Check
The activity log reports the overall results of the readiness check as well as the results
for each individual test.
entries.

Table 4-1. Activity Log Entries

Icon
Text Color
Green
Black
Black
Black
Red
The status bar at the bottom of the window indicates one of the following states for the
current operation:
Busy
A readiness check is in progress. Allow time for the task to complete.
Ready
The system meets the prerequisites for the Active Upgrade process. You can
proceed with the upgrade process by splitting the system.
Broken
One or more components in the system does not meet the prerequisites for the
Active Upgrade process. You must resolve the problem before you can continue
with the upgrade.
(For more information about interpreting Active Upgrade status, see
Upgrade Process Status" on page
If the check is successful, you can click Split to proceed with splitting the system. See
"Splitting the
If one of the readiness tests fails, you must resolve the problem, then click Retry to run
the readiness test again. When the problem is resolved, you can click Split to proceed
with splitting the system.
4-2
Express5800/320Ma: Active Upgrade™ User's Guide
Table 4-1
Severity
Success
Pending
Information
Warning
Error
System".
describes the general meaning of the activity log
Description
Task completed without error
Task is in progress
Task information, no action necessary
A problem that should be addressed, but will not
block an upgrade
A problem that must be corrected before continuing
with upgrade
4-21.)
"Viewing Active

Advertisement

Table of Contents
loading

Table of Contents