Download Print this page

Honeywell TRADELINE Q7300H Series Installation Instructions Manual page 3

2000 commercial thermostat subbases
Hide thumbs

Advertisement

SUBBASE
T
T7047C
T
T
T7047C
T
T
Fig. 4. Four T7047C Sensors providing
temperature averaging network for
T7300/Q7300 Thermostat/Subbase.
SUBBASE
T
T
T7047G
T7047G
T
T
T
T7047G
T7047G
T
T
T
Fig. 5. Five T7047G Sensors providing
temperature averaging network for
T7300/Q7300 Thermostat/Subbase.
Q7300H SERIES 2000 COMMERCIAL THERMOSTAT SUBBASES
T
T7047C
T
T
T7047C
T
T
M4840
T
T7047G
T
T
T
M4841
T7047C
T
T
T7047C
T
T
T7047C
T
T
Fig. 6. Nine T7047C Sensors providing
temperature averaging network for
T7300/Q7300 Thermostat/Subbase.
Mount Subbase
Mount the subbase horizontally on the wall or on a
2 in. x 4 in. wiring box:
1. Position and level the subbase or wallplate (for
appearance only). The thermostat functions properly
even when not level.
2. Use a pencil to mark mounting holes. See Fig. 7.
3. Remove subbase or wallplate from the wall and
drill two 3/16 in. holes in the wall (if drywall) as
marked. (For firmer material such as plaster or
wood, drill two 7/32 in. holes.) Gently tap anchors
(provided) into drilled holes until flush with the wall.
4. Position the subbase over the holes, pulling wires
through the wiring opening.
5. Loosely insert the mounting screws into the holes.
6. Tighten the mounting screws.
WIRES
THROUGH WALL
WALL
ANCHORS (2)
Fig. 7. Mounting the subbase.
3
SUBBASE
T
T
T7047C
T7047C
T
T
T
T7047C
T7047C
T
T
T
T7047C
T7047C
T
T
T
WALL
MOUNTING
HOLES (2)
MOUNTING
SCREWS (2)
62-0155—3
T
T
T
M4842
M16055

Advertisement

loading

  Also See for Honeywell TRADELINE Q7300H Series

  Related Manuals for Honeywell TRADELINE Q7300H Series

This manual is also suitable for:

Tradeline q7300h2003Tradeline q7300h2011Tradeline q7300h2029Tradeline q7300h2037Tradeline v5011aTradeline v5011c ... Show all