When Changing Schedule Setting - Mitsubishi Electric LAN Control Utility User Manual

Lan control utility
Hide thumbs Also See for LAN Control Utility:
Table of Contents

Advertisement

6. Schedule setting
<Note>
• The power supply ON and the power supply OFF can not be selected at the same time of the same day of the
week.
• The Schedule Setting will be executed while "ProjectorView Global+" is in operation.
• Depending on usage conditions, such as when there are so many projectors that you need to control, the time
to be executed by the power supply control may deviate from the setting time of the schedule.
• When utilizing the Network Time Protocol (NTP) function on the Internet, the schedule operation may not be
executed because the setting time of the schedule jumps over.
• When the automatic time adjustment by summer time is valid, the schedule operation may not be executed
because the time is automatically adjusted before and after switching over.

6.2. When changing schedule setting

(1) Select a group which you like to change from the Group select pull-down menu on the main
screen.
(2) Select "Edit Schedule Setting" from "Configuration" of the menu bar.
• "Edit Schedule Setting" window is displayed.
(3) Change the contents which you like to correct, and click [Save].
• Corrected contents are reflected.
EN-18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Projectorview global+

Table of Contents