Maintenance Service; Maintenance Support Period; Post Start-Of-Operation Changes To The Configuration - Fujitsu Eternus DX60 User Manual

Disk storage system
Hide thumbs Also See for Eternus DX60:
Table of Contents

Advertisement

Chapter 9 Operation and Maintenance

9.3 Maintenance Service

9.3
Maintenance Service
This section explains the ETERNUS DX60/DX80/DX90 maintenance service.
IMPORTANT
9.3.1

Maintenance Support Period

The maintenance support period for the ETERNUS DX60/DX80/DX90 is 5 years from the date of
purchase of the ETERNUS DX60/DX80/DX90.
9.4

Post Start-of-Operation Changes to the Configuration

This section explains the procedure to change the configuration after starting the system opera-
tion, using the following example. Refer to necessary part of this section.
• Replacing Fibre Channel Cards
• Replacing LAN Cards / iSCSI HBAs
• Replacing SAS Cards
Refer
When performing service maintenance, the maintenance engineer connects
a PC used for maintenance to the device.
Also, the maintenance engineer may require information that is necessary
for performing maintenance operations.
If the maintenance engineer has any require, we ask that they be handled.
Do
CAUTION
When you detect abnormality of the ETERNUS DX60/DX80/DX90,
Contact your maintenance engineer immediately.
When changing the configuration, record the change by using the
memo page in "ETERNUS Disk storage systems User's Guide -
Server Connection-" and so on.
"ETERNUS Disk storage systems User's Guide -Server Connection-"
ETERNUS DX60/DX80/DX90 Disk storage system User Guide
Copyright 2011 FUJITSU LIMITED
204
P3AM-3042-08ENZ0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx90Eternus dx80

Table of Contents