•
Step
8.
1.
Install the Handrail
Support
(15) between
the Upright Tubes (5,4) with four 5/16"x 3/4" Button
Head Socket
Bolts (152).
2.
Put the Beverage
Holder
(150) on the Handrail
Support
(15).
131
1'50
/
/
/
/
/
/
/
/
/
/
/
/
/
/
NOTE: Please Tighten
All Screws
After All Component
Assembly
is Complete.
11
F80 / F83 / F85