Unpacking Your Dryer - Haier RDE 350AW User Manual And Installation Instructions

Gas & electric dryer
Hide thumbs Also See for RDE 350AW:
Table of Contents

Advertisement

Available languages

Available languages

spade lug connectors with upturned ends or closed loop connectors and marked
for use with clothes dryers.
(When sold in Canada - 4-wire power supply cord provided and
attached on dryer)
Dryers being installed in a manufactured (mobile) home MUST employ a
4-wire power supply cord NEMA 14-30 type SRDT or ST (as required) rated
to 240 Volt AC minimum, 30 Amp, with 4 open-end spade lug connectors
with upturned ends or closed loop connectors and marked for use with clothes
dryers. See Electrical Connections for more information on a 4-wire system.
O utlet Receptacle
NEMA 10-30R receptacle should be located so the power supply cord is
accessible when the dryer is in the installed position. (Canada - NEMA 14-30R
receptacle)
ELECTRICAL REQUIREMENTS
Gas Dryer:
(RDG350AW)
C ircuit
Individual 15 Amp branch circuit fused with 15-Amp maximum time delay fuse
or circuit breakers.
P ower Supply
3 wire, 120 Volt, 1 Phase, 60Hz, AC
P ower Supply Cord
The dryer is equipped with a 120 Volt 3-wire power supply cord.
Note: This dryer is equipped with a three-prong grounding plug for your
protection against shock hazard and should be plugged into a properly
grounded three-prong receptacle. Do not under any circumstance cut or
remove grounding prong from plug.

Unpacking Your Dryer

1. Remove all packaging material. This includes the foam base and all adhesive
tape holding the dryer accessories inside and outside.
2. Inspect and remove any remains of packaging, tape or printed materials
before using the dryer.
English
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents