Dip Switch - Hitachi WJ200 Series Software Manual

115vif-din 115 vac input interface board for crane & hoist pendant applications
Hide thumbs Also See for WJ200 Series:
Table of Contents

Advertisement

Terminal 2
C002
Function
Terminal 3
C003
Function
Terminal 4
C004
Function
Terminal 5
C005
Function
Terminal 6
C006
Function
Terminal 7
C007
Function
Terminal 8
C008
Function
C011 thru
Terminal Active
C016[DN]
State
Reset function
C102
selection
Accel / Decel
P031
Option
Note 1: Actual setting is dependent on inverter capacity and your design requirements. Software controlled when applicable.
Note 2: C011 to C018 in the case of SJ700 series
Note 3: The parameters initial values are set by activating the EzSQ program.
Other Required Settings
The following were previously noted in the Installation and Wiring chapter, but are important and bear
repeating. Make sure the following steps were performed.
WJ200
Please confirm that the jumper bar/wire is between PLC and L, as explained in Chapter 2, for proper operation
of the 115VIF-DIN interface board.
SJ700
The SR/SK DIP switch in close proximity to the terminal connection block must be in default "SR" position.
Confirm that the source/sink jumper bar is between PLC and CM1, as explained in Chapter 2. Confirm the
correct setting of B091 for load-brake vs. non-load-brake applications. Please verify the SJ700 parameter A017
is set to 01 and a jumper or closed contact is wired between P24 and FW to enable to program to run.
Software Use Set Up
The EzSQ program needs to be successfully downloaded to the inverter and activated through the A017
selection to 02. The software is designed to utilize the intelligent logic inputs to determine the rotation direction,
and speed of the motor based on the various contact states as presented to the inverter through the 115VIF-DIN.
Please remember to test the software with a disconnected load, and perform all activities and take all proper
precautions before activating the software or inverter. Safety in operation should be the primary concern.
Please visit our website at
suggestive use crane and hoist program in our application notes section.
01
SJ700 Open Loop = [RV] Reverse run
57
WJ200 & SJ700 Closed Loop = [MI2]. See note 3.
58
EzSQ input 2
59
EzSQ input. Horizontal over-travel limit. = [MI4]. See note 3.
60
EzSQ input. N.C. from hoist UP limit. =[MI5]. See note 3.
18
[RS] Reset on WJ200.
EzSQ input. This input switches the software from 2 speeds to infinite speed
62
control. =[MI7]. See note 3.
no
[NO] No Function – Available on SJ700 only
All inputs should be configured for N.O. (normally open = active on)
00
operation (Note 2)
Makes the RESET [RS] input terminal (input 6) active only when the inverter
2
is in the fault state. In this way, the pendant DOWN pushbutton can also
used to reset an inverter fault. See note 3.
This allows the EzSQ software to determine the programmed acceleration
03
and deceleration rates. If F002 and F003 are used, set to 00.
http://www.hitachi-america.us/ice/inverters/
Page 10 of 15
Program Flowchart and Index
nd
speed / increase speed. = [MI3]. See note 3.
for the ProDriveNext software and

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj700 series

Table of Contents