Section 3: Setup; Preparation; Unpacking; Needed For Setup - Grizzly G0750G Owner's Manual

12" x 36" gunsmith's lathe
Hide thumbs Also See for G0750G:
Table of Contents

Advertisement

preparation

the list below outlines the basic process of pre-
paring your machine for operation. specific steps
are covered later in this section.
The typical preparation process is as follows:
1.
unpack the lathe and inventory the contents
of the box/crate.
2.
Clean the lathe and its components.
3.
identify an acceptable location for the lathe
and move it to that location.
4.
Level the lathe and bolt it to the floor.
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the lathe is ready for operation.
6.
Check lathe for proper lubrication.
7.
Connect the lathe to the power source.
8.
test run lathe to ensure it functions properly.
9.
perform the spindle break-in procedure to
prepare the lathe for operation.

Unpacking

Your machine was carefully packaged for safe
transportation. Remove the packaging materials
from around your machine and inspect it. If you
discover any damage, please call us immediately
at (570) 546-9663 for advice.
Save the containers and all packing materials for
possible inspection by the carrier or its agent.
Otherwise, filing a freight claim can be difficult.
When you are completely satisfied with the condi-
tion of your shipment, inventory the contents.
-16-

SEcTION 3: SETUp

SUFFOCATION HAZARD!
Keep children and pets away
from plastic bags or packing
materials shipped with this
machine. Discard immediately.

Needed for Setup

the following are needed to complete the setup
process, but are not included with your machine.
for Lifting and Moving:
— A forklift or other power lifting device rated
for at least 2000 lbs.
— two lifting straps rated for at least 2000 lbs.
each
— A lifting safety hook rated for at least 2000
lbs.
— Another person for moving machine
for power connection:
— A power source that meets the minimum cir-
cuit requirements for this machine (review
power Supply on page 14 for details)
— An electrician or qualified service person-
nel to ensure a safe and code-compliant
connection to the power source
for Assembly:
— shop rags
— Cleaner/degreaser (see page 18)
— Quality metal protectant lubricant
— safety glasses for each person
— Floor mounting hardware as needed (see
page 22)
— precision level at least 12" long
Model G0750G (Mfg. Since 11/12)

Advertisement

Table of Contents
loading

Table of Contents