Mid-Mounting A Switch In A Two-Post Rack - Extreme Networks Summit X150 Series Hardware Installation Manual

Summit x150/x250e/x350/x440/x450/x450a/x450e/x460/x480/x650/x670 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Mid-Mounting a Switch in a Two-Post Rack

To mid-mount a Summit X460 series switch in a two-post rack:
1 Attach an ESD-preventive wrist strap to your bare wrist and connect the metal end to an appropriate
ground point on the rack.
2 On one side of the switch, set the bracket against the switch housing, with the flange toward the
back of the switch (see
3 Use six of the provided screws to secure the bracket to the switch housing.
4 Repeat step
2
to attach the other bracket to the other side of the switch.
Figure 163: Attaching a Rack-mounting Flange
5 Slide the switch into the equipment rack
Figure 164: Installing the Summit X460 Series Switch
Summit Family Switches Hardware Installation Guide
Figure
163).
(Figure
Installing a Summit X460 Series Switch
SH_197
164).
SH_198
221

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents