Installation, Operation and Maintenance
1.5 Through 5 Ton
Split System Air Conditioner
TABLE OF CONTENTS
INTRODUCTION ..............................................................................1
CODES ............................................................................................1
Clearances ..........................................................................2
Support ..............................................................................2
Exposure ............................................................................2
Braze Joints ..............................................................................3
Evacuation ................................................................................3
Precautions ................................................................................4
Liquid Line Sizes........................................................................4
LIMITED WARRANTY ....................................................................7
NOTE:
THESE INSTRUCTIONS ARE INTENDED AS AN AID TO QUALIFIED
SERVICE PERSONNEL FOR PROPER INSTALLATION, ADJUSTMENT
AND OPERATION OF THIS EQUIPMENT. READ THE ENTIRE
INSTRUCTION MANUAL THOROUGHLY BEFORE ATTEMPTING
INSTALLATION OR OPERATION.