Emerson E2 Installation And Operation Manual page 253

For rx refrigeration, bx hvac, and cx convenience store controllers
Hide thumbs Also See for E2:
Table of Contents

Advertisement

viewing 12-12
date and time stamp 12-12
dial-out 10-22
The Alarm Output 10-22
The Display Line 10-22
The Echelon Network 10-22
forced to normal. See Alarms, reset to nor-
mal.
resetting 12-14
reset-to-normal 12-13
return-to-normal 12-13
state, in advisory log 12-12
the Alarm Annunciator 10-22
Alternate I/O Formats 10-27
Analog Sensor Control 11-38
Anti-Sweat
case-controlled 11-13
dewpoint input 11-14
how setpoints work 11-14
how anti-sweat works 11-45
setup 11-45
zones, definition of 11-45
Application Setup 10-25
-B-
Base Log Group 11-17
Battery 4-5
enable switch 4-6
low 4-6, 12-18
replacement 4-6
test 4-6
Baud Rates 10-12
E2
RS-232 port 10-12
E2, setting for I/O Network 10-12
I/O Network 6-3
8DO 6-3
8IO 6-3
ARTC 6-3
E2 6-3
IRLDS 6-3
Blue "R". See Cold Reset.
Board Types 6-1
Boards on the I/O Network 10-2, 10-15
Boiler 11-55
Alarms 11-55
Box to Box Communications 7-1
I-2
E2 RX/BX/CX I&O Manual
Box-To-Box 1-5
Building Controller 1-2
Buttons
cold reset 10-1
reset 10-1
BX Capabilities 1-2
BX Home Screen 12-1
-C-
Case Circuits, Standard. See Standard Circuits.
Case Control Circuits
associating CC-100s with 11-16
defrost in 11-12
overview 11-10
Case Controllers
anti-sweat control 11-13
associating with Case Control Circuits 11-16
CC-100H
defined 2-12, 11-10
CC-100LS
defined 2-12, 11-10
CC-100P
defined 2-12, 11-10
clean mode 11-14
CS-100
defined 2-12, 11-10
defrost 11-12
pump down delay 11-12
defrost types 11-12
digital sensors
installing 9-14
dual temp control 11-14
EEPRs
recovery mode 11-12
fail-safe mode 11-15
fan control 11-14
humidity sensor installation 9-15
inputs 9-14
installation guide 8-6
light control 11-14
mounting dimensions 3-5
power modules
wiring 9-15
wiring schematic 9-15
problems with cases F-6
recovery mode
EEPRs 11-12
026-1610 Rev 12 25-APR-2011

Advertisement

Table of Contents
loading

Table of Contents