Lenovo 019624U Hardware Maintenance Manual page 87

Hardware maintenance manual
Table of Contents

Advertisement

Applying labels to the base cover
The new base cover FRU is shipped with a kit containing labels of several kinds. When you replace the
base cover, you need to apply the following labels:
If the Windows Certificate of Authentication label (COA)
old part with the label attached to the customer, or provide a letter to the customer stating what the label
was originally on the system and what the label part number, serial number, and product key were.
4
Information label under battery
8
FCC label
9
Homologation label
14
Serial number blank label
Following labels need to be peeled off from the old base cover, and need to be put on the new base cover.
1
Ethernet label
3
SID card label
5
SIM ICCID label
6
China Mobile label/China Telecom label
7
Non Encryption label/Indonesia rating label
10
Brazil ANATEL label
11
Israel homologation label
12
Malaysia SIRIM label
13
Indonesia Postel label
15
Wireless WAN label
16
Wireless LAN label
For some models, you also need to apply one or two FCC labels. Check the old base cover; if it has one or
two FCC labels, find duplicates of them in the label kit and apply them to the new base cover.
2
is attached to a part that is replaced, return the
.
Chapter 8
Removing and replacing a FRU
81

Advertisement

Table of Contents
loading

Table of Contents