Operating Appliance - Kenmore K90-150 Owner's Manual

Gas-fired direct vent condensing hot water boiler
Table of Contents

Advertisement

Refer
to the appropriate
diagrams
in Section
VII,
"Near Boiler Piping,"
for more information.
1. Close
all zone service
valves
on the supply
and return
piping.
Open
the feed valve and fill
boiler
with water.
Make
sure
air vent
is open.
Hold relief valve open until water runs air free for
five seconds
to rapidly
bleed air from boiler, then
let the relief valve snap shut.
2. Open the zone
service
valve
on the
pipe for the first zone.
Open
the purge
valve
on the first zone.
Feed
water will fill the zone,
pushing
air out the purge valve. Close the purge
valve
when
the water
runs air free. Close
the
zone service valve.
3. Repeat
step 2 for all remaining
zones.
4. Open
all service
valves.
Any
air remaining
trapped
in the return
lines between
the service
valves and the boiler will be pushed
towards
the
air vent when the boiler is placed
in operation.
5. Inspect
piping system.
Repair any leaks im-
mediately.
4. Open the expansion
tank service
valve
and
the tank vent.
Fill the tank to the proper
level
and close
the tank vent.
Remove
the
handle
from the expansion
tank
service
valve
so the
homeowner
doesn't accidentally
close
it.
5. Open
all service
valves.
Any
air remaining
trapped
in the return lines between
the service
valves
and the boiler will be pushed
towards
the
expansion
tank when the boiler
is placed
in op-
eration.
6. Inspect
piping system.
Repair any leaks im-
mediately.
OTE: DO NOT use stop leak compounds.
Leaks
in"_
readed connections in the aluminum boiler sections mus._t I
e repaired immediately. Aluminum
threads will not seal I
emselves.
J
(_
READ BEFORE
OPERATING
APPLIANCE
,,_
1. This appliance
does
not have
a pilot.
It is
equipped
with an ignition device which automat-
ically lights the burner.
Do NOT try to light this
burner by hand.
2. Before
operating
smell all around
the appli-
ance area for gas. Be sure to smell next to the
floor because
some gas is heavier
than air and
will settle to the floor.
Refer to the appropriate
diagrams
in Section
VII,
"Near Boiler Piping," for more information.
1. Close all zone
service
valves
on the supply
and return piping and close the expansion
tank
service
valve.
Drain
expansion
tank.
Open the
feed valve and fill boiler with water.
Hold relief
valve open until water
runs air free for five sec-
onds to rapidly
bleed air from boiler, then let the
relief valve snap shut.
2. Open the zone
service
valve
on the
pipe for the first
zone.
Open
the
purge valve
on the first zone.
Feed
water
will fill the zone,
pushing
air out the purge valve.
Close the purge
valve
when the water
runs air free. Close
the
zone service
valve.
3. Repeat step 2 for all remaining
zones.
3. Use only your hand to turn the gas shut off
valve.
Never use tools. If the valve will not turn
by hand,
do not try to repair
it, call a qualified
service
technician.
Force
or attempted
repair
may cause fire or explosion.
4. Do not use this appliance
if any part has been
under
water.
Immediately
call a qualified
ser-
vice technician
to inspect
the appliance
and to

Advertisement

Table of Contents
loading

This manual is also suitable for:

K90-125K90-200K90-175

Table of Contents