Kenmore POWER MISER 153.35862 Owner's Manual page 17

Power vent gas water heater
Table of Contents

Advertisement

Installation
Instructions
(cont'd)
VENTING
SYSTEM EXAMPLE
INSTALLATIONS
FOR ALL MODELS
(cont'd)
,
,
i
i
.
2. Horizontal runs requzrea m n mum ¼ rise per foot.
35' MAX.
16"HIN.
13"MIN.
I 1" MIN.
MIN. RISE¼"
PEP.FOOT
3. A vertical run can be no more than 20'.
4. The total vertical and horizontal run cannot exceed 35'.
HIN. RISE ¼"
ONE ELBOW
PER FOOT
MAX. 20'
TOTAL VEffFICAL AND
HORIZONTAL
RUNS
CANNOT
EXCEED 35'
T
I
I
MIN. RISE ¼"
PER FOOT
TOTAL VERTICAL AND
HORIZONTAL
RUNS
CANNOT
EXCEED 351
17
CEMENTING PVC, ABS OR CPVC PIPE AND FITTINGS
Read and observe all safety information
printed
on primer,
cleaner, and cement containers.
DANGER
PHmer, cleaner, and cements are extremely flammable.
They are harmful or fatal if swallowed. The vapors are
harmful.
They may irritate
eyes and skin and can he
absorbed through the skin.
PRECAUTIONS
Always store primers, cleaner, and cements in cool, dry,
well ventilated
places. Do not store them near heat,
sparks, or flames. Keep containers closed. Use them in
well ventilated
areas. Wear
impervious clothing while
handling. Do not smoke, eat, or drink while handling.
Wash thoroughly after handling and before eating. Wear
eye protection when handling. If swallowed, drink water,
do not induce vomiting,
and call a physician or poison
control center immediately.
If inhaled, get fresh air and
seek medical attention
if ill feelings persist. In case of
eye and skin contact, immediately
flush with plenty of
water for 15 minutes and seek medical attention if irri-
tation persists. KEEP OUT OR REACH OF CHILDREN.
All primers, cleaners, and cements must meet all local codes and
applicable
standards
of the American
Society For Testing
Materials Standards.
Before using primers, cleaners, and cements, stir or shake, mak-
ing sure contents are liquid. Do not use if found to be lumpy or
jelly-like.
--
1. Cut pipe ends squarely removing all burrs and dirt.
2. Dry fit pipe and fittings to be connected for proper fit.
3. Clean pipe and fitting with a primer/deaner.
4. Apply a thin coat of cement to fitting, avoiding puddling
inside.
5. Apply a liberal coat of cement to pipe leaving no voids.
6. QUICKLY assemble parts while cement is flui!! If you wait
too long, re-coat pipes.
7. Push pipe completely into socket of fitting, turning as it goes
until it bottoms.
8. Hold p_e and fitting together for 30 seconds. Then carefully
clean orr excess with a cloth. Allow connections
a sufficient
time to cure before disturbing.
9. Remember that vent pipes must be adequately and securely
supported.
APPROXIMATE SETTING TIME FOR 2½" TO 4" PIPE
OINTS
MOVEMENT
COMPLETE
OF JOINT
SET
90°F to 150°F
_A hr.
8 hrs.
50°F to 90°F
1 hr.
15 hrs.
O°Fto 50°F
1¼ hr.
18 hrs.

Advertisement

Table of Contents
loading

Table of Contents