Craftsman ZTS 7500 Operator's Manual page 10

107.249210 2-bin bagger
Hide thumbs Also See for ZTS 7500:
Table of Contents

Advertisement

Available languages

Available languages

Figure 7. Remove Baffle and Hardware
A. BaffJee
B. Carriage
Bolts
C. Nuts
D. Mower Deck Housing
iNSTALL
BLOWOUT
BAFFLES
1, Remove and discard existing baffles (A, Figure 7)
carriage bouts (B) and nuts (C) from mower deck
housing (D),
2, UnstaHLH baffle (A, Figure 8), and secure with
5/16-18 x 5/8 carriage bouts (C) and 5/16-18 Whiz
Lock nuts (D),
3, UnstaHRH baffle (B), and secure with 5/16-18 x 5/8
carriage bouts (C) and 5/16-18 Whiz Lock nuts (E),
Figure 8. Blowout
Baffle Installation
A. Baffle, LH
B. Baffle, RH
C. Carriage
Bolts, 5/16-18 x 5/8
D. Nut, Whiz Lock, 5/18-18
10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

107.249210

Table of Contents