Hitachi XP P9500 User Manual page 187

Hitachi dynamic link manager software user guide for aix (6.6) (t5208-96012, november 2011)
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

8
Choose Hot Plug Task.
.
The Hot Plug Task window appears.
9
Choose PCI Hot Plug Manager.
.
The PCI Hot Plug Manager window appears.
10
Select List PCI Hot Plug Slots to check the PCI slot to be replaced:
.
The shading indicates the PCI slot where the HBA is to be replaced.
11
Go back to the PCI Hot Plug Manager window, select Unconfigure a
.
Device, and enter in Device name the device that is to be replaced.
For the Unconfigure any Child Devices and KEEP definition in
database items, select yes.
12
Go back to the PCI Hot Plug Manager window, select Replace/Remove a
.
PCI Hot Plug Adapter.
Select the HBA to be replaced.
13
Select Replace in the input field.
.
14
When the following message is displayed, replace the HBA:
.
When you finish replacing the HBA, connect the cable and press Enter.
15
Execute the following command to reconfigure the device:
.
# cfgmgr -l fcsn
To reconfigure the device, specify the device name of the PCI slot where
the HBA was replaced (fcs device); n indicates the instance number of
the fcs device.
Hitachi Dynamic Link Manager User Guide (for AIX(R))
HDLM Operation
4-25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynamic link manager

Table of Contents