Connect Power - HP StorageWorks NAS 8000 - Version 1.6.X Manual

Nas 8000 san high availability solution integration manual
Hide thumbs Also See for StorageWorks NAS 8000 - Version 1.6.X:
Table of Contents

Advertisement

Figure 10: NAS Server Tape Library HBA Ports

Connect Power

Note:
Connect the UPS (optional).
1. Install the power and battery modules into the frame. See the UPS user's guide for more
2. Form an ethernet connection between the UPS and the NAS Server through the local area
HP StorageWorks NAS 8000 SAN High Availability, Solution Integration Manual (SIM)
Each server node will have its own UPS monitoring connection.
information.
— Power module: Slide the module into a bay until flush with frame. Tighten the two
screws to secure the module.
— Battery module: Lift the module and slide it completely into the frame. Align the tab
on top of the module with the connector inside the bay. Tighten the two screws to
secure the module.
Caution:
Install battery modules just prior to running the UPS. The battery modules
discharge slowly when loaded prematurely and can be permanently damaged.
network. See
Figure 2
on page 10 for a diagram showing the sample LAN connection for
your configuration.
— Select an ethernet port on the server to communicate with the UPS.
— In Command View NAS, click the Configuration tab.
— Select UPS.
— Select Actions > Edit UPS Properties.
— Input the correct information in the Edit UPS Properties dialog box, then click OK.
1
1 . Slots 1 and 2 reserved for
tape HBAs
Installation Guide
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks nas 8000

Table of Contents