Intergraph ImageStation Z Installation And Use Manual page 10

Softcopy production system
Table of Contents

Advertisement

6
4.
Slide the interface PEM into the PEM bracket mounted to the underside of the digitizer table.
Refer to the following figure.
PEM
Bracket
NOTE
Ensure that the cables extend to the back of the interface PEM. Verify that the front feet of the
interface PEM install into the holes provided in the PEM bracket. These holes provide a positive lock-
down to prevent unwanted movement of the interface PEM.
5.
The Altek digitizer controller is pre-mounted on the underside of the table as shown in the
following figure. Connect the 15-pin to 9-pin Analog to Digital converter to the port labeled
Cursor on the Altek digitizer. Connect the other end of the RS-232 cable that you connected to
Tablet in step 3, to the 15-pin to 9-pin Analog to Digital converter. Tighten the cable screws.
Interface PEM
Altek
Digitizer
Controller
15-pin to 9-pin
Analog to Digital
Converter
To AC
Adapter
Interface PEM
To COM 1
To Tablet
AC Power Cord
Receptacle
To COM 2
To Two-
Handed
Controller

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ImageStation Z and is the answer not in the manual?

Questions and answers

Table of Contents