GE JKD910 Owner's Manual page 15

Electric warming drawer
Hide thumbs Also See for JKD910:
Table of Contents

Advertisement

Read these instructions completely and carefully.
Provide Cabinet Support
23
1
2
IMPORTANT: When installed below a single or
double oven, check to be sure that any oven
supports above the cutout do not obstruct the
23
1
required depth of the warming drawer
2
cutout.
A 2 minimum clearance between oven
and warming drawer cutouts are required.
Additional clearance may be required if
2 x 4 blocks are used to support runners or
solid floor of the oven above.
The warming drawer may be supported by
either a solid bottom, 2 x 4 or 2 x 2 runners.
Step 1—Install Anti-Tip Brace
WARNING: ANTI-TIP PRECAUTIONS:
The anti-tip brace must be installed to prevent
the drawer from tipping forward when opened
and loaded.
Failure to do so could result in personal injury.
2 x 4 or equivalent runners
22
27
2 x 4 or equivalent runners
23
1
2
25
30
The support must be level and rigidly
mounted, flush with the bottom edge
of the cutout.
There is no way to level the drawer once it
has been installed. Be sure supports are level.
The entire weight of the drawer is supported
by the runners or solid floor and must be
capable of supporting 150 lbs.
Install 2x4 or 2x2 anti-tip brace
against rear cabinet wall 9
from floor to bottom of brace
9
2x4 or 2x2 runners
or solid bottom
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jtd910

Table of Contents