Power Cycling Modules - HP Cisco MDS 9216 - Fabric Switch Configuration Manual

Cisco mds 9000 family fabric manager configuration guide, release 3.x (ol-8222-10, april 2008)
Hide thumbs Also See for Cisco MDS 9216 - Fabric Switch:
Table of Contents

Advertisement

Reloading Modules
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m
You see a list of modules contained in the selected switches.
Click the Card Module Status tab.
Step 3
You see the information shown in
Figure 19-2
Step 4
Check the Reset check box in the row of the switch to reload.
Step 5
Click the Apply Changes icon.

Power Cycling Modules

To power cycle any module using Fabric Manager, follow these steps:
Step 1
Do one of the following in the Logical Domains pane:
Step 2
Expand Switches and select Hardware from the Physical Attributes pane.
Step 3
Click the Card Module Status tab.
Check the Reset check box in the row for the module(s) you want to reset.
Step 4
Click the Apply Changes icon.
Step 5
Caution
Cisco MDS 9000 Family CLI Configuration Guide
19-6
Card Module Status Tab
Click SAN to display a list of all switches in the SAN.
Click one of the fabrics to display a list of switches for that fabric.
Click a VSAN to display a list of switches for that VSAN.
Resetting a module disrupts traffic through the module.