4.7.2

Piping Connections to Liebert XDP or Liebert XDC

Piping Installation for Hard Piped System
The assembly and connection means for piping in the Liebert XD system are similar to those used for
conventional refrigeration systems. All piping should be installed with high-temperature brazed
joints. Soft solder is not recommended. During brazing, the lines must be filled with flowing dry nitro-
gen to prevent excessive oxidation and scale formation inside the piping. Prevailing good refrigeration
practices must be employed for piping supports, leak testing, dehydration and charging. Failure to
use good system practices may result in damage to the system. Refer to the ASHRAE refrigeration
handbook for general good-practice refrigeration piping.
Follow all guidelines in 3.13 - Liebert XD Piping System Design and 3.14 - Liebert XD Piping
Slope during installation.
Figure 45 Hard-pipe connection diagram for Liebert XDV, Liebert XDO and Liebert XDH cooling modules
Return Main
(seen from end )
2-1/8" O.D.
Or 2-5/8" O.D.
1/2" Refrigerant -Grade
Full-Port Ball Valve
Field-Supplied and
Field Installed
Refer to Table 5 for details.
Liebert XD Cooling Modules—Liebert XDO, Liebert XDV, Liebert XDH and Liebert XDCF
Acceptable Arc
Supply Main
(seen from end )
1-1/8" O.D.
or 1-3/8" O.D.
Supply
to Cooling Module
Rear of
XD Cooling
Module
Recommended Arc
Either 5/8" or 7/8"
Refrigerant -Grade
Full-Port Ball Valve
Field-Supplied and
Field Installed
Copper Tubing
Total length of each line
from XD cooling module
(XDH, XDO, XDV) to Main;
not to exceed 72" (1829 mm)
Return from Cooling
Module
Top of XD Cooling Module
45