Revision History - Honeywell DCP301 User Manual

Digital program controller
Table of Contents

Advertisement

Revision History

Printed
Manual Number
Date
99-04
EN1I-6197
00-06
00-08
01-06
03-06
03-08
04-02
Edition
Revised pages
1st Edition
2nd Edition iv
SERVICE CENTERS Address of JAPAN was changed
3rd Edition 7-32
11-10
4th Edition
7-32
5th Edition
8-4
8-10
10-6, SAFETY
REQUIREMENTS
Programming
Map Draft Form
6th Edition
4-3
4-17, 4-18
8-5, 8-7, 8-8
8-7, 8-8
8-10
Index-1 to 3
7th Edition
4-2
10-6
10-6, 1 to 11
Description
Instruction Manual.was changed to User's Manual
No. 84 and No. 85 Items was changed
PV Input 100% of Gain No. 1 and Gain No. 8 was
changed
No. 94
Unused
PID type changed
G.Soak time-out added
I Setting up G.Soak time-out items added
Applicable standards added, EN61326
G.Soak time-out added
Fujikura Cable Co. → Fujikura Ltd.
Handling Precautions added, to connect SG
terminals each others.
Setting range: 0.0 to 599.9 (0.1s) added.
ON time setting + 0.1 to 599.9 (0.1s) added.
Setting range changed "0 to 1000U" to "0.00 to
99.59 (h:min/min:s) or 0.0 to 599.9 (0.1s)" in
G. Soak time-out items.
Allover revised.
The 8th item of Handling Precautions added.
Item of Altitude added.
Description change based on the European
standards revision.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents