Event Scheduling - Hitachi CP-AW250NM Operating Manual

Hide thumbs Also See for CP-AW250NM:
Table of Contents

Advertisement

7.3 Event Scheduling

The scheduling function enables to setup scheduled events including power on /
power off. It enables to be "self-management" projector.
• You can schedule the following control events: Power, Input Source,
NOTE
My Image, Messenger, Slideshow. (
• The power on / off event has the lowest priority among the all events that are
dened at the same time.
• There are 3 types of Scheduling, 1) daily 2) weekly 3) specic date. (
• The priority for scheduled events is as follows 1) specic date 2) weekly 3)
daily.
• Up to ve specic dates are available for scheduled events. Priority is given to
those with the lower numbers when more than one event has been scheduled
for the same date and time (e.g., 'Specic date No. 1' has priority over 'Specic
date No. 2' and so on.
• Be sure to set the date and time before enabling scheduled events. (
56)
7. Other Functions
55)
58)
81

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Cp-aw250n

Table of Contents